Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

This guide is intended to help you upgrade your existing WiscNet managed Cisco ME3400 router to a new WiscNet managed Cisco ASR-920.

...

  1. Install the ASR-920 in a location as close as possible to the existing ME3400. Please see Figure  1 below showing a production ME3400 close to a staged ASR920.

    1. Figure 1

      Image Modified


  2. Plug the power cord into Power Supply PS-0; connect the other end to an AC power source. Do the same for Power Supply PS-1. The ASR-920 takes up to 15 minutes to boot.
  3. If your router came with a USB-A to RJ45 serial console adapter, model A920-CONS-KIT-S, plug it into the USB port labeled "CONSOLE" on the ASR-920 for emergency access.
  4. You can see more ASR-920 specifications  and port descriptions here WiscNet Managed CPE#CiscoASR920

...

  1. Take a photo of the existing ME3400 that shows the current ports and cables being used. This can help if troubleshooting is necessary.

  2. Trace each cable plugged into the ME3400 to its origin and label it accordingly. Put a "LAN" label on the cable(s) that go to your network (i.e. firewall, switch, patch panel, etc.). Put a "WAN" label on the cable that goes to the Internet (i.e. BadgerNet 3, Charter, dark fiber, etc.). Note: BadgerNet Connections often connect to a Juniper device. Charter or other provider's devices usually have a prominent "Owned By" label on them.

  3. Label each fiber-optic strand on your ME3400 indicating Transmit ( T or ← ) or Receive ( R or → ). See photo in Figure 2 below for guidance. Note: you can skip this step for any copper cables that are connected to the ME3400.

    1. Figure 2

      The top optic has a patch cable with permanent marker arrows drawn on to document polarity.

      Image Modified


      NOTE: The Transmit connector is on the left and Receive on the right when the top of the SFP's handle is closed and facing upward towards you (such as when plugged into an ME3400). FlexOptix optics have a small triangle on the top of each port indicating light direction.

...

  1. While the ME3400 is still connected, go to a hard-wired computer inside your network, and run a bandwidth test using: fast.com and record the results.

  2. Disconnect the ME3400 network cables and connect them to the ASR-920 as illustrated in Figures 3 and 4 below. Figure 4 identifies the standard WAN and LAN port assignments. Figure 5 can help you identify ASR-920 port numbering.

    1. Figure 3

      Image Modified



    2. Figure 4 - WiscNet ASR-920 Standard Configuration

      PRIMARY

      CPE TYPE

      Outside WAN
      Connections

      Internal LAN
      Connections

      Cisco ME3400E
      (ME3400-2-CS)

      2
      Copper or SFP

      1
      Copper or SFP


      Cisco ASR 920
      (ASR920-2G-4-10G)

      Port 3
      (SFP/SFP+)

      Port 2
      (SFP/SFP+)


      Note

      Port 2 on the ASR-920 is in the BOTTOM LEFT position, and Port 3 is in TOP LEFT position. Please see Figure 5.

      Port 2 is "upside down" so TRANSMIT is on the RIGHT and RECEIVE is on the LEFT.



    3. Figure 5

      Image Modified


  3. The two triangular status lights above port 2 and below port 3 will change to green after a few seconds when they're linked.
    1. Note you may see other status lights flashing red lights on the ASR-920 during this process. Please ignore them for now.

  4. Check your Internet connection to see if it is working.
    1. If you can access the Internet, proceed to the Post Installation Instructions.
    2. If you cannot access the Internet, refer to the Troubleshooting section.

...

If you're performing the upgrade on your own during business hours you can contact WiscNet to assist with troubleshooting by calling 608-442-6761 x2.  If not performing the upgrade during business hours, please fallback to the ME3400 to restore service (see below) and contact WiscNet support during the next available business hours.

ASR-920 boot time

Allow sufficient boot time – these devices can be quite slow to fully initialize at boot up.  Please allow at least 20 minutes for ASR-920 and 15 minutes for ME3400 (in the event of a failback)

...

For fiber connections – double check Transmit and Receive orientation.  Remember that ports on the bottom are upside down compared to those on the top.  The Transmit and Receive cables may be safely reversed to see if that solves the problem. Ports not linked will be amber colored, ports that are linked will be green. In Figure 6 (below) port 3 is not linked and is amber, port 2 is linked and is green. Figure 5 (above) can help identify which port is alarming.

Figure 6

Image Modified

Layer 3 troubleshooting steps

...